Application Details
Web Reference:

Application Date:

30-Mar-2017

Planning Application Ref:

17/000013/REG3

Registration Date:

06-Apr-2017

Decision Date:

12-Jul-2017

Despatch Date:

13-Jul-2017

Application Type:

Regulation 3

Extension of time to:

Parish:

Worcester ( Worcester City District )

County Electoral Division:

St Peter (Worcester City) St Peter ( Worcester City )

Main Location:

Red Hill C of E Primary School, Midhurst Close, WORCESTER, WR5 2HX

Proposal:

Extensions and alterations to the existing School including a six classroom two-

Full Description:

Extensions and alterations to the existing School including a six classroom two-storey extension, to accommodate expansion from a one form entry school to a two form entry school, and external works which include additional parking and hard play areas.

Status:

Status Description:

Comment:

This application has already been decided. You cannot comment on it

Applicant Details

Title:

 

Forename/Initial:

 

Surname/Company Name:

Worcestershire County Council 

Company Contact Name:

Lorraine Buswell 

Address:

Worcestershire County Council, County Hall, Spetchley Road, WORCESTER, WR52NP 

Case Officer:

Mr Steven Aldridge 

Agent Details

Title:

 

Forename/Initial:

 

Surname/Company Name:

Jacobs UK 

Company Contact Name:

Robert Lewin-Jones 

Address:

Jacobs UK, Malvern Court, Whittington Hall, Whittington, Worcester, WR5 2RA 

Decision Details

Decision:

 

Decision Date:

12-Jul-2017 

Publicity Details

Publicity Start Date:

20-Apr-2017 

Publicity End Date:

11-May-2017 

Conditions/Reasons For Refusal

There are no prescription details for this application

Associated Media

Description_ Filename_
01 Application Form 01_ApplicationFormNoPersonalData.pdf
02 Expansion Design and Access Statement 02__Expansion_Design_and_Access_Statement.pdf
03 Preliminary Outline Design Statement 28.03.17 03_Preliminary_Outline_Design_Statement_28.03.17.pdf
04 Planning Noise Assessment R1 04_Planning_Noise_Assessment_R1.pdf
05 Site Investigation Report G1-1 05_Site_Investigation_Report_G1-1.pdf
06 Preliminary Ecological Appraisal Report Mar 17 06_Preliminary_Ecological_Appraisal_Report_Mar_17.pdf
07 Transport Assessment with Appendices 07_Transport_Assessment_with_Appendices.pdf
08 Arboricutural Impact Assessment.pdf ( with Drawings) 08_Arboricutural_Impact_Assessment.pdf_(_with_Drawings).pdf
09 Document Issue Register - Planning 09_Document_Issue_Register_-_Planning.pdf
10 Drawing issue sheet Development Planning 28.03.17 10_Drawing_issue_sheet_Development_Planning_28.03.17.pdf
11 Site Plan as Existing 11_Site_Plan_as_Existing.pdf
12 Site Plan Proposed 12_Site_Plan_Proposed.pdf
13 Proposed Site Plan 01 13_Proposed_Site_Plan_01.pdf
14 Proposed Site Plan 02 14_Proposed_Site_Plan_02.pdf
15 Site Plan - Work Sections 15_Site_Plan_-_Work_Sections.pdf
16 Level 0 (Existing School Level) Plan 16_Level_0_(Existing_School_Level)_Plan.pdf
17 Level 1 Plan, Proposed Ground Floor 17_Level_1_Plan,_Proposed_Ground_Floor.pdf
18 Level 2 Plan - First Floor 18_Level_2_Plan_-_First_Floor.pdf
19 3D External Views 19_3D_External_Views.pdf
20 Sections- Classroom Block 20_Sections-_Classroom_Block.pdf
21 Elevations - Classroom Block 21_Elevations_-_Classroom_Block.pdf
22 Site Sections 22_Site_Sections.pdf
23 Sections and Elevations - front Extension 23_Sections_and_Elevations_-_front_Extension.pdf
24 Outline SuDS Scheme 24_Outline_SuDS_Scheme.pdf
25 Permeable Paving with Control Chamber 25_Permeable_Paving_with_Control_Chamber.pdf
26 Permavoid Rainwater Storage Tank 26_Permavoid_Rainwater_Storage_Tank.pdf
27 Post Retaining Wall 27_Post_Retaining_Wall.pdf
28 Downpipe into 3-Sett Channel 28_Downpipe_into_3-Sett_Channel.pdf
29 Baffle in Subbase Storage 29_Baffle_in_Subbase_Storage.pdf
30 Hard Play Storage to Pond 30_Hard_Play_Storage_to_Pond.pdf
31 Public Notice (Dated 20th April 2017) 31_Public_Notice_(Dated_20th_April_2017).pdf
32 Lighting Scheme - Type K - Realta (5) 32_Lighting_Scheme_-_Type_K_-_Realta_(5).pdf
33 Lighting Scheme - Starbeam (3) 33_Lighting_Scheme_-_Starbeam_(3).pdf
33 Lighting Scheme 33_Lighting_Scheme.pdf
35 Expansion Addendum Transport Assessment 35_Expansion_Addendum_Transport_Assessment.pdf
36 Expansion Addendum Appendix A 36_Expansion_Addendum_Appendix_A.pdf
37 Expansion Addendum Appendix B 37_Expansion_Addendum_Appendix_B.pdf
38 Email from Robert Bray Associates 38_Email_from_Robert_Bray_Associates.pdf
39 Calculations for the 1 in 10 Year Return Period 39_Calculations_for_the_1_in_10_Year_Return_Period.pdf
40 Calculations for the 1 in 100 Year Return Period 40_Calculations_for_the_1_in_100_Year_Return_Period.pdf
41 Calculations for the 1 in 100 Year Return Period in the Hard Play 41_Calculations_for_the_1_in_100_Year_Return_Period_in_the_Hard_Play.pdf
42 Decision Notice 42_Decision_Notice.pdf
43 2017.07.11 Minutes No 973 43_2017.07.11_Minutes_No_973.pdf
44 Report Pack - Tuesday 11th July 2017 44_Report_Pack_-_Tuesday_11th_July_2017.pdf
 

Appeal Details

There are no appeal details for this application

Consultees

Name Type Address Last Letter Date Target Response Date
Dr John Cairns Councillor 168 Battenhall Road,Worcester,Worcestershire,WR5 2BT
Dr Marc L. Bayliss Councillor 4 Copsewood Avenue,Worcester,WR5 1SH
Mr Mike Design out crime officer Stephenson Police Station, Castle Street, Worcester, WR13AD
Douglas Castle Ramblers Association 11, Woodshears Drive, MALVERN, WR143EA

Amendments

There are no amendments for this application
HTS Name: wphappdetail-default.hts
Logical ID: WPHAPPDETAIL